A returning customer has tasked Ruag MRO International with performing a 3C-check, ADS-B Out upgrade and partial cabin refurbishment on a Dassault Falcon 900LX. The work is to be completed in a single downtime. The aircraft is scheduled to arrive at the site in Geneva-Meyrin, Switzerland, in September 2019.
“Optimising heavy maintenance checks, like this 3C-check, allows our customers to save on both time and costs,” said Stephan Woodtli, managing director for Ruag MRO International’s Lugano and Geneva sites. “Planning the inspection together with the additional aircraft services streamlines the processes and ultimately allows our customer’s aircraft to keep flying profitably for longer.”
Ruag has been encouraging Falcon customers to equip their aircraft for compliance with the EASA ADS-B Out mandates during heavy maintenance checks. “We are dedicated to ensuring our customers’ safe operations, as well as their continued airworthiness,” said Woodtli. “The 7 June 2020 deadline is approaching fast. We want to make sure our customers have what they need and when they need it.”